Numbering audit
Gapless continuity — the first thing an inspection checks.
2 series
| Series | Allocated | Voids | Continuity |
|---|---|---|---|
| FV/2026 | 001 – 104 | /077 anulowana | ✓ no gaps |
| FZ/2026 | 001 – 009 | — | ✓ no gaps |
Gapless continuity — the first thing an inspection checks.
| Series | Allocated | Voids | Continuity |
|---|---|---|---|
| FV/2026 | 001 – 104 | /077 anulowana | ✓ no gaps |
| FZ/2026 | 001 – 009 | — | ✓ no gaps |